EDP Baixo Sabor: Construction Phase – Invasive Plant Species (work fronts) [2010-2014]
Basic Information
Abstract
The dataset contains records of vascular plants collected in the lower valley of River Sabor (NE Portugal) in the scope of the long-term Ecological Monitoring Program (PME) of the Baixo Sabor Hydroelectric Dams (AHBS), promoted by EDP – Energias de Portugal, S.A, to assess the spreading capacity of exotic invasive species in the work front (dam structures and complementary works – dam yards, quarries, heaps, work front and road accesses) during the dams construction period (2010-14). Plant inventories were collected in line transects performed on foot, in all work front sites, along 42 km upstream, in the Sabor valley, and in the Vilariça stream.
Keywords
Contact
Owner/Creator
UUID
2950f4ed-3476-49a4-b3f5-33735693e266
Dates
Date Range
-
Post date
Wednesday, January 27, 2021 - 18:11
Last modified
Tuesday, September 13, 2022 - 16:17
Downloads
Online Locator
Distribution Function
File for download
Recommended citation
Recommended Citation
Mota P, Moreira da Silva D, Marques dos Santos M, Múrias T (2021). EDP Baixo Sabor: Construction Phase – Invasive Species (work fronts) [2010-2014]. EDP - Energias de Portugal. Sampling event dataset https://doi.org/10.15468/4k2ybf accessed via GBIF.org on 2022-09-13.
Geographic
Show details for observation location(s):