EDP Baixo Sabor: Construction Phase – Invasive Plant Species (work fronts) [2010-2014]

Basic Information
Abstract
The dataset contains records of vascular plants collected in the lower valley of River Sabor (NE Portugal) in the scope of the long-term Ecological Monitoring Program (PME) of the Baixo Sabor Hydroelectric Dams (AHBS), promoted by EDP – Energias de Portugal, S.A, to assess the spreading capacity of exotic invasive species in the work front (dam structures and complementary works – dam yards, quarries, heaps, work front and road accesses) during the dams construction period (2010-14). Plant inventories were collected in line transects performed on foot, in all work front sites, along 42 km upstream, in the Sabor valley, and in the Vilariça stream.
Owner/Creator
UUID
2950f4ed-3476-49a4-b3f5-33735693e266
Dates
Date Range
-
Last modified
Tuesday, September 13, 2022 - 16:17
Downloads
Online Locator
Distribution Function
File for download
Recommended citation
Recommended Citation
Mota P, Moreira da Silva D, Marques dos Santos M, Múrias T (2021). EDP Baixo Sabor: Construction Phase – Invasive Species (work fronts) [2010-2014]. EDP - Energias de Portugal. Sampling event dataset https://doi.org/10.15468/4k2ybf accessed via GBIF.org on 2022-09-13.